Entry and powder bath to the left. Looking into the kitchen.
Looking into the kitchen and at the back is the living room and to the left of that is the dining room.
Where Nate is standing is the stove. Waiting on counter tops and the handles for the cabinets still need installed.
Looking from the living room back through the kitchen to the entry. The front door has not been installed yet, so hard to see the actual entry.
Dining room at the back with doors out to a deck.
Master bedroom. Doors out to our deck.
Walk-in shower with pebble floor.
The kids bathroom. The cabinets are in and the counter top/sink units soon.
Fireplace with built-ins to the left. We are still undecided on the fireplace stone. The tv will hang above the fireplace.
Nate's shop. The garage door has been installed since this picture. This area is underneath the dining room, living room and master bedroom. This will be awesome to have him "in" the house, but able to work.
Lots has been done since I took these pictures. Hoping in the next 2-3 weeks we are moving items in. The plan is to move stuff in and get somewhat organized before we start staying there.
No comments:
Post a Comment